3
关注
1552
浏览

Activity-based costing (ABC)

查看全部 2 个回答

徐锦标 注册会员 用户来自于: 四川省成都市
2018-10-20 12:40
作业成本法—一种成本会计体系,它根据作业表现将成本累计起来,再用成本动因把这些成本分配到产品或其他基础之上,如客户、市场或项目。该方法尝试将间接成本分配到更现实的基础之上,而不是分配到直接人工或机时上。同义词:activity-based cost accounting,activity-based costing model.

关于作者

问题动态

发布时间
2016-08-11 00:00
更新时间
2018-10-23 09:05
关注人数
3 人关注

相关问题

库存管理abc分析法的知识点汇总
costing level
Activity-based planning (ABP)
costing object category
base object costing
costing date
direct costing
zero costing sheet
overhead costing
product costing

推荐内容

branch warehouse demand
discounted cash flow
delivery speed
design-to-order
bilateral contract
complete and on-time delivery (COTD)
CSCMP
collaborative planning, forecasting, and replenishment (CPFR)
critical-to-quality characteristics (CTQs)
design changeover flexibility
All Rights Reserved Powered BY WeCenter V4.1.0 © 2023 京ICP备16065701号