A finite loading technique that plans orders around bottleneck work centers. The objective is to maximize total production throughput. Orders in small lot sizes aggregate into large lot sizes at the constraint and then load forward. Prior operations are then backward-scheduled, and downstream operations are forward-scheduled. See: drum-buffer-rope, order-oriented finite loading.
阅读全文
收起全文